Construction solutions September 1st 2011 Temporary power and temperature
control solutions specialist, Aggreko,
provided a temporary heating and
dehumidification package to main
contractor FCC Elliott Construction
to assist in the construction
programme of the new 312 bed South
West Acute Hospital at Enniskillen in
Northern Ireland.
Aggreko initially supplied six
125kW IDF heaters and 12 1600KT
dehumidifier packages to dry and
heat the clinical and ward blocks of
the new hospital to 6°C to enable
painting of the interiors.
Moisture and temperature control
equipment was also supplied in
basement corridors to protect
electrical equipment and busbars
from moisture. More articles from Aggreko UK Ltd: |